• CONSTRUCTION OF 24 RUN DESIGNS WITHIN A SPLIT-PLOT STRUCTURE

ARCHANA VERMA*, MITHILESH KUMAR JHA

Abstract


In industries, often the size of an experiment needs to be kept small due to time and/or cost constraints. Hadamard matrices of order 24 have been used in this paper for the construction of some new 24 run designs within a split-plot structure. The D-values of the designs for different variance ratios are also computed.


Keywords


In industries, often the size of an experiment needs to be kept small due to time and/or cost constraints. Hadamard matrices of order 24 have been used in this paper for the construction of some new 24 run designs within a split-plot structure. The D-valu

Full Text:

PDF


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
© 2010-2022 International Journal of Mathematical Archive (IJMA)
Copyright Agreement & Authorship Responsibility
Web Counter
https://journals.zetech.ac.ke/scatter-hitam/https://silasa.sarolangunkab.go.id/swal/https://sipirus.sukabumikab.go.id/storage/uploads/-/sthai/https://sipirus.sukabumikab.go.id/storage/uploads/-/stoto/https://alwasilahlilhasanah.ac.id/starlight-princess-1000/https://www.remap.ugto.mx/pages/slot-luar-negeri-winrate-tertinggi/https://waper.serdangbedagaikab.go.id/storage/sgacor/https://waper.serdangbedagaikab.go.id/public/images/qrcode/slot-dana/https://waper.serdangbedagaikab.go.id/public/img/cover/10k/https://waper.serdangbedagaikab.go.id/storage/app/https://waper.serdangbedagaikab.go.id/storage/idn/